Reeman AMR | Intelligent Material Handling Robot Transform industrial logistics from “manual transportation” to “all-scenario flexible manufacturing.”
Four innovative technologies to confront complex factories
1.Laser SLAM + 3D vision fusion navigation
There is no need to lay magnetic strips or reflectors, and there is zero modification on site
0.5 seconds dynamically replan the path, intelligent bypass barriers (people, stacks, cargo)
Narrow channel / high dynamic warehouse for stable operation with ± 2 cm accuracy
2. Automatic elevator up and down & cross floor moving
Inventing elevator intermodal control technology, robots can call and enter and exit the elevator Autonomously
The entire floor is accessible without barriers, enabling material flow in the warehouse and various workshops
Reality case: A textile company → 200 + jobs across floors per day, 4 people → 1 person monitors, and the efficiency improves 3 times.
600kg heavy load + automotive suspension
3."Iron ox" series: rated load 600kg, peak load 700kg
Car-grade independent suspension, full load over ditch, no capsizing and no loosening of the speed belt
Adapted to electronics, auto parts, heavy industry, and e-commerce shelf lifting
4. System-wide docking + multi-machine coordinated scheduling
Deep interworking with ERP, WMS, MES, automatic dismantling of production plan → material requirements → handling instructions
Single system supports 50 + robots cluster scheduling, dynamically allocating tasks, collision prevention, and path optimization
Gree Electrical Equipment Zhuhai plant: Multiple machines moving across floors → Production line lack of material downtime ↓ 80%, overall efficiency ↓ 35%
Rated load capacity:Back
Core technical specifications (Iron Bull Series 600kg model).
| Project | Parameters |
|---|---|
| Rated load capacity | 600 kg |
| Navigation Method | Laser SLAM + 3D Visual Fusion |
| Positioning accuracy | ±2 cm (dynamic), ±1 cm (alignment) |
| Maximum speed | 1.5 m/s (adjustable with full load). |
| Climbing capability | 5° (fully loaded), 8° (empty). |
| Obstacle-surmounting capability | 15 mm steps, 30 mm crevices. |
| Battery life | 8–10 hours (can be automatically recharged). |
| Safety Sensors | Lidar + 3D depth camera + touch sensor + emergency stop. |
| Communication Method | Wi-Fi 6/5G, supports industrial wireless roaming. |
| Integration systems | ERP / WMS / MES / SCADA |
Typical Return on Investment Analysis (Illustrated with an Example of a Medium-Sized Assembly Line)
| Project | Traditional manual labor | 8 forklifts/Reeman AMR cluster |
|---|---|---|
| for direct personnel handling | (three shifts); 6 personnel (rotating shifts) | 1 person for remote monitoring |
| Annual labor costs | ≈ 600,000 yuan | ≈ 100,000 yuan |
| Equipment investment | orklifts + maintenance ≈ 300,000 yuan | AMR + dispatching system ≈ 800,000yuan |
| Material shortage-related downtime losses | ≈ 200,000 yuan/year | ≈ 40,000 yuan/ year. |
| Annual overall cost | ≈ 1.1million yuan | ≈540,000 yuan. |
Static investment payback period ≈ 8 months (includes deployment, testing, and training).
Why can procurement decision-makers feel confident in choosing Reeman?
Risk-free deployment: Provide 30 days of trial operation for the production line. If it does not meet the standards, it can be returned.
Zero infrastructure modification: no damage to the floor, no wiring required, and non-disruptive installation.
Rapid scaling: New robots have been added to existing systems, and they can be integrated and deployed within 2 hours.
Industrial-grade reliability: MTBF ≥ 2000 hours, continuous operation 7×24 hours.
Localization Services: 12 service centers nationwide, response time of 2 hours, on-site service available 24 hours a day.
Typical application industries.
Automotive components (heavy chassis, engine handling).
Assembly of home appliances (cross-floor line-side supply).
Textile dyeing and printing (stable operation in high-temperature and high-humidity environments).
E-commerce warehousing (full-rack picking, restocking).
3C Electronics (lightweight, multi-item, small batch, flexible logistics).
Take immediate action to obtain a customized solution.
You will immediately notice a significant reduction in your factory’s material handling costs.
Free on-site assessment + report on energy efficiency improvements.
Please provide a table outlining the calculations for the return on investment, with the data being as precise as your current production line data.
Supports the option of leasing/renting first and then purchasing later to reduce initial investment.
Contact us:
📮Email: jason.jiao@Reeman.net
☎️X:+86-18157427859
📖Facebook:13586696132
Follow Us:https://www.reemanrobotics.com/
Facebook: https://www.facebook.com/reemanrobotics
Youtube: https://www.youtube.com/@reemanrobotics/videos
















